Check out the building progress of our house! (from March 2006 just scroll down) |
|||||
(from January 2006 click here) |
|||||
(late november 2005 click here) |
|||||
(early november 2005 click here) |
|||||
(october 2005 click here) |
|||||
(back to the about us page click here) |
|||||
|
|||||
| The roof is finished! |
|||||
![]() |
|||||
The space for the triangle window |
|||||
![]() |
|||||
The loft |
|||||
![]() |
|||||
The basement floor - level sand |
|||||
![]() |
|||||
Basement floor with styrofoam insulation |
|||||
![]() |
|||||
Pipes for radiant floor heating in basement |
|||||
![]() |
|||||
| Concrete floor poured in basement |
|||||
![]() |
|||||
Straw bales arrive! |
|||||
![]() |
|||||
Straw walls going up
|
|||||
![]() |
|||||
Rowan at the front door |
|||||
![]() |
|||||
| Tractor with empty wagon and our house! |
|||||
|
|||||
the porch floor is framed in |
|||||